Stage Rigging and Stage Equipment Source: Carbon Stage & Studio


Pipe

Carbon Stage & Studio carries 1-1/2" and 2" schedule 40 & schedule 80 pipes to which drapery, scenery, and lights are attached for counterweight systems or suspended for non-moving applications such as pipe grids or dead hung battens. Schedule 40 is the industry standard and is an ideal solution for spans less than 10'-0". Schedule 80 has a thicker wall, and is typically used for greater spans.



Item Description Item No. List Price Per
Battens 1-1/2" sch 40: incl black paint and milling. . . . . . . . . . . . 01-1.5-40 POR foot
Battens 1-1/2" sch 80: incl black paint and milling. . . . . . . . . . . . 01-1.5-80 POR foot
Battens 2" sch 80: incl black paint and milling. . . . . . . . . . . . 01-02-80 POR foot
Truss Battens sch 10 - complete. . . . . . . . . . . . . . . . . . . . . . . . 01-TR-10 POR foot
Truss Battens sch 40 - complete. . . . . . . . . . . . . . . . . . . . . . . . 01-TR-40 POR foot
Sleeving - sch 10 1-5/8": cut no milling or hdwr. . . . . . . . . . . . 01-SL-10 POR foot
Sleeving - sch 40 1-1/2": cut no milling or hdwr. . . . . . . . . . . . 01-SL-40 POR foot
Sleeving - sch 80 1-1/2": cut no milling or hdwr. . . . . . . . . . . . 01-SL-80 POR foot

POR = Price on request
Copyright © 2003-2005 Carbon Stage LLC, All rights reserved.